So here's an update on progress.  

Last week, Chuck and I leveled the trailer, getting it on 8 concrete footings.  Darren and Chuck moved all the gravel.  


Last Saturday, we had some volunteers, and they removed the cabinets inside, enlarged 3 of the 4 windows, fixed the rotten areas, and began adding 2x2s to the exterior.  Once the 2x2s are added, we'll add foam insulation (bottom left), place the framing on top, OSB sheets to the outside, and the trusses on the top.  We probably won't be able to do the final siding and shingles until the spring and warmer weather. Hopefully the framing and OSB will be done within a week and half (before the really crazy busy Christmas season gets going in full gear). 


Inside progress: